CONCRETE PROJECTS

Over the years, Kilcon concreters have worked on a vast array of large and small concreting projects, spanning all aspects of concreting works. Check out our gallery below to see the scope of our work.

Concreters With Passion

THE GOOD GUYS BALLINA

DSCN1409.JPG
DSCN1407.JPG
DSCN1405.JPG
DSCN1406.JPG
DSCN1402.JPG
DSCN1403.JPG
DSCN1404.JPG

When: 2004

Type of Construction:

  • Strip footings on timber piles and raft slab

  • Tilt panel walls

  • External pavement

  • Footpaths

  • Heavy duty vehicular pavement

This project was a testament to our team's dedication to safety and program. A large floor slab, 36 large tilt panels and footings all done in one month.

BOGARTS AT BYRON

DSCN1261.JPG
DSCN1260.JPG
DSCN1259.JPG
DSCN1258.JPG
DSCN1257.JPG
DSCN1255.JPG
DSCN1256.JPG
DSCN1254.JPG

Builder: Greg Clark Building

When: 2002

Type of Construction: Multi Story (5)

On this project we provided Greg Clark Building a complete structure package with Formwork, reo fix (mix of conventional and PT) and concrete placement.

This building not only had two levels constructed below sea level, but has single sided formed basement walls.

LISMORE MEMORIAL BATHS

DSCN1401.JPG
DSCN1399.JPG
DSCN1398.JPG
DSCN1396.JPG
DSCN1397.JPG
DSCN1398 (2).JPG

Builder: Seymour Whyte

When: 2004

Type of Construction:

  • Concrete and reo fix to walls and floors of balance tanks

  • Olympic pool

  • Half olympic pool

  • Waders pool

  • Concourse pavements

BOGANGAR PRIMARY SCHOOL

Bogangar primary school concreting project.JPG
DSCN1206.JPG
DSCN1205.JPG
DSCN1201.JPG

Builder: Watpac

When: 2003

Type of Construction:

  • Strip footings and raft slab

  • External colour pavement

  • Footpaths

  • Heavy duty vehicular pavement

This project had nearly 4 acres of concrete and posed its own unique problems being built so close to the beach in the fine powdery white sand

GORDON BLAIR DRIVE

DSCN1287.JPG
DSCN1286.JPG
DSCN1283.JPG
DSCN1285.JPG
DSCN1284.JPG

Builder: Field Constructions
When: 2016
Type of Construction:

  • Concrete place formwork and reo fix to foundations

  • Floors on ground

  • External pavements

  • Coloured driveways


NORTHERN RIVERS FORD

DSCN1391.JPG
DSCN1393.JPG
DSCN1392.JPG

Builder: Greg Clarke Building

When: 2020

Type of Construction:

  • Strip footings and raft slab

  • External pavement

  • Footpaths

  • Heavy duty vehicular pavement

This project is currently under construction for repeat clients GCB on the Frizelle's Lismore site

LISMORE MAZDA

DSCN1394.JPG
DSCN1395.JPG

Builder: Greg Clarke Building

When: 2011

Type of Construction:

  • Screw pier

  • Foundations

  • Slab on ground

  • Three story blade columns

  • External pavement

  • Footpaths

  • Heavy duty vehicular pavement

LISMORE TOYOTA

DSCN1303.JPG
DSCN1312.JPG
DSCN1311.JPG
DSCN1310.JPG
DSCN1308.JPG
DSCN1307.JPG
DSCN1306.JPG
DSCN1305.JPG
DSCN1304.JPG

Builder: Hutchinson Builders

When: 2016

Type of Construction:

  • Concrete Formwork and reo fix to foundations

  • Floors of retention tank

  • External pavements and driveways

QUAYSIDE MOTORS LISMORE

DSCN1385.JPG
DSCN1389.JPG
DSCN1390.JPG
DSCN1388.JPG
DSCN1387.JPG
Lismore Quayside motors built by Kilcon concreting

Builder: Crisci Constructions
When: 2006
Type of Construction:

  • Concrete Formwork and reo fix to foundations

  • Floor slabs

  • Suspended stairs and slabs

  • Tilt panel walls

  • External pavements and driveways

WESTPAC HELICOPTER BASE LISMORE

IMG_7220.JPG
IMG_7218.JPG
IMG_7219.JPG
IMG_7216.JPG
DSCN1320.JPG
DSCN1318.JPG
DSCN1314.JPG
DSCN1317.JPG
DSCN1315.JPG

Builder: Greg Clarke Building

When: 2017

Type of Construction:

  • Concrete place formwork and reo fix to foundations

  • Floors on ground

  • Columns

  • Suspended slabs

  • Tilt panel walls

  • External pavements and driveways

SUMMERLAND CHRISTIAN SCHOOL

DSCN1275.JPG
DSCN1276.JPG
DSCN1273.JPG
Summerland Christian school concrete building by Kilcon
DSCN1282.JPG

Builder: Greg Clarke Building

When: 2020

Type of Construction:

  • Concrete place and reo fix to foundations

  • Floors on ground and suspended

  • External pavements and driveways

LISMORE DIGESTER REACTOR

DSCN1302.JPG
DSCN1301.JPG

Builder: Stirlock

When: 2019

Type of Construction:

  • External Pavement
  • Footpaths

  • Heavy duty vehicular pavement

EXTENSION TO TWEED CIVIC CENTRE

DSCN1220.JPG
DSCN1219.JPG
DSCN1218.JPG
DSCN1217.JPG
DSCN1216.JPG
DSCN1215.JPG
DSCN1214.JPG
DSCN1213.JPG
DSCN1212.JPG

TWEED REGIONAL GALLERY

DSCN1252.JPG
DSCN1249.JPG
DSCN1251.JPG
DSCN1250.JPG
DSCN1245.JPG
DSCN1247.JPG
DSCN1248.JPG
DSCN1242.JPG
DSCN1241.JPG
DSCN1239.JPG
DSCN1238.JPG
DSCN1237.JPG
DSCN1236.JPG
DSCN1235.JPG
DSCN1233.JPG
Tweed Regional Gallery built by Kilcon Concreting

CENTRELINK MURWILLUMBAH

DSCN1230.JPG
DSCN1231.JPG
DSCN1229.JPG
DSCN1228.JPG
DSCN1227.JPG
DSCN1225.JPG
DSCN1226.JPG
DSCN1224.JPG
DSCN1223.JPG
DSCN1222.JPG
DSCN1221.JPG